Serving Oakland and Macomb Counties Office hours: Monday–Friday, 8:30 a.m.–4:30 p.m.

The short answer

What does your Oakland Township property need?

Tell us the address, affected system, symptoms, and urgency. For a planned furnace, air conditioner, tankless water heater, panel, or radon project, include the equipment you have and the result you want. Our office confirms service fit, access, and scheduling before an appointment is set.

What Sandison evaluates

Service for the systems your household depends on

  • Leaks, fixtures, drains, sump pumps, and water lines
  • Furnaces, cooling, boilers, airflow, and controls
  • Panels, circuits, surge protection, and EV charging
  • Water heaters, filtration, and NRPP-certified radon mitigation

Local project planning

Equipment changes may involve more than one township permit

Oakland Township publishes separate plumbing, mechanical, and electrical permit guidance. Its examples include furnace and central-air replacement, gas piping, new water heaters, supply and drain piping, and electrical service changes. These are useful planning references; the permit and inspection path must still be confirmed for the proposed work. A tankless upgrade can involve plumbing, gas delivery, venting, drainage, and power, while a furnace change can involve electrical and air-distribution work. We define these connections in the scope before work begins.

Water and basement systems

Start with the water supply and equipment actually serving the property

Tell the office whether your home uses municipal water or a private well, and whether there is a pressure tank, softener, filtration system, sump pump, or backup pump. Those details help us prepare for a pressure complaint, sediment concern, loss of water, or basement-water event. We do not assume that every Oakland Township property has the same utilities. A useful visit record separates the affected fixtures, operating conditions, measured findings, concealed areas, and repair options so you know what has been established and what still needs investigation.

Coordinated upgrades

Plan heating, hot water, and electrical demand together

Before replacing equipment, consider the other work you expect to do at the property. An EV charger, larger water heater, new cooling equipment, or basement project can affect electrical demand, piping routes, drainage, access, and future maintenance. Sandison can review the related systems within the agreed scope and explain the work that belongs with the utility, township, or another specialist. For radon concerns, provide the test result and foundation information; recommendations depend on the building and verification after mitigation.

Primary references

Verify the local and credential information.

Common questions

What property owners ask

Does Sandison serve Oakland Township?

Yes. Oakland Township is in our Oakland County service area. Call (248) 453-1227 or request service online; the office confirms the address, scope, and availability.

Can I call about an emergency after office hours?

Call (248) 467-1761 for urgent failures. Emergency calls are accepted 24/7, subject to technician, location, equipment, and parts availability. For immediate danger, leave the area and contact 911 or the utility first.

Evidence and review

Why this page can be trusted

Service coverage follows Sandison's established Oakland County territory. The township reference supports local permit planning; the illustration does not represent a documented job at a particular address.

Updated . Contact Sandison to confirm the scope and requirements for your property.

Save$50on service
A welcome from Sandison

Put $50 back in your pocket.

New residential customers can save $50 on a qualifying completed repair or installation.

Offer codeWELCOME50

Licensed multi-trade service · Office-confirmed scheduling

New residential customers only. One offer per household. Cannot be combined with another offer. Not valid for dispatch or diagnostic fees, maintenance plans, permits, or after-hours emergency service. Qualifying work and final eligibility are confirmed before service.